Technical Specifications

Deployment and connection FAQ

Clear documentation on electrical voltage, gas line pressure, water quality requirements, and flexible rental terms for urgent utility outages.

24/7

Engineering Hotline

480V / 3P

Standard Electrical

Turnkey

Bypass Hookups

System Requirements

Answers for plant engineers

01
02
03
04

Electrical service specs

Fuel supply and pressure

Water treatment standards

Rental term flexibility

Mobile boiler trailers require standard 480V, 3-phase electrical service for burner controls, feed pumps, and draft fans. Generator packages can be supplied for remote utility yards.

Units operate on natural gas, #2 fuel oil, or dual-fuel configurations. Minimum gas train pressure requirements range from 5 to 15 PSIG depending on boiler horsepower rating.

Incoming feed water must meet strict hardness and oxygen scavenger parameters to protect pressure vessels. On-site portable softeners and chemical feed skids are included in turnkey deployments.

Contracts scale from 30-day emergency minimums to multi-month plant overhauls, with straight-time extensions and immediate buyout options available.

Have specific connection constraints?

Talk directly with our senior boiler engineers to verify utility compatibility before dispatch.